泰安
切换分站
免费发布信息
HDPE土工膜锚固结构分析
  • HDPE土工膜锚固结构分析
  • HDPE土工膜锚固结构分析
  • HDPE土工膜锚固结构分析
  • 地址:开发区 39.78.18.*
    • Q Q:349863220QQ在线交谈
    • 联系人:姬经理
    • 电话:1885387**** 点击查看完整号码
      • 便民网提醒您:让你提前汇款,或者价格明显低于市价,均有骗子嫌疑,不要轻易相信。
  • 信息详情
       以HDPE土工膜为核心材料的防渗结构广泛应用于国民经济各领域防渗工程,由于HDPE土工膜是一种柔性防渗材料,且在两个膜之间、膜与PE管道之间的焊接安装因同为PE;材质可达到较好的密封效果。但是一般在防渗边界,土工膜与刚性基础或墙壁,由于材料特性的差异,两者无法直接焊接安装,因此,现有的处理工艺如下:首先在刚性基础上设置基坑,然后将土工膜的末端牵引至基坑内,最后再向基坑内浇注混凝土,以解决防渗边界的密封问题。.上述处理方式对于长距离的防渗边界来说,施工时不仅耗费较多的工时,还会造成施工人员工作量的大幅增加,使得土工膜的铺设以及密封成本增加。
The anti-seepage structure with HDPE geomembrane as the core material is widely used in anti-seepage engineering in various fields of national economy. Because HDPE geomembrane is a kind of flexible anti-seepage material, and the welding and installation between the two membranes and between the membrane and PE pipe are PE; the material can achieve better sealing effect. But generally in the anti-seepage boundary, the geomembrane and rigid foundation or wall cannot be directly welded and installed due to the difference of material characteristics. Therefore, the existing treatment process is as follows: first, the foundation pit is set on the rigid foundation, then the end of the geomembrane is pulled into the foundation pit, and finally the concrete is poured into the foundation pit to solve the sealing problem of the anti-seepage boundary. . for the long-distance anti-seepage boundary, the above treatment method not only consumes more working hours, but also causes a significant increase in the workload of construction personnel, which increases the cost of laying and sealing geomembrane.
       HDPE土工膜锚固结构,包括土工膜、压条以及多个膨胀螺栓,所述土工膜与刚性基础面贴合,所述压条与土工膜的防渗边界齐平,且每一个所述膨胀螺栓依次活动贯穿压条、土工膜后与刚性基础面连接;所述土工膜的上端部沿背离所述刚性基础面的方向翻折,直至将多个所述膨胀螺栓、压条完全包裹,且所述土工膜的,上端部与土工膜本体的.上表面焊接。
HDPE geomembrane anchorage structure includes geomembrane, compression strip and a plurality of expansion bolts, the geomembrane is connected with the rigid foundation surface, the compression strip is flush with the anti-seepage boundary of the geomembrane, and each expansion bolt successively moves through the compression strip, the geomembrane is connected with the rigid foundation surface; the upper end of the geomembrane turns in the direction away from the rigid foundation surface, Until a plurality of the expansion bolts and a pressing strip are completely wrapped, and the upper end of the geomembrane is welded with the upper surface of the geomembrane body.
       在土工膜铺设完毕后防渗边界的处理工序相对麻烦,且耗费大量的人力物力,增加了土工膜在防渗工程中的铺设成本,对此,申请人直接摒弃传统的设置预埋基坑的方式,先将压条与所述土工膜的防渗边界齐平,然后利用膨胀螺栓依次贯穿土工膜、土工布后与刚性基础面连接,确保压条在刚性基础面上投影正对的土工膜紧贴在刚性基础面上,并且土工膜的上端部朝远离刚性基础面的方向翻折,直至将压条以及膨胀螺栓完全包裏后,再利用焊机将土工膜的翻折部分与其本体的外壁焊接,以防止在防渗边界附近的液体沿压条、土工布与膨胀螺栓之间的间隙进入到土工膜与刚性基础面之间,避免出现防渗边界的密封效果失效。
After the geomembrane is laid, the treatment process of the seepage control boundary is relatively troublesome, which consumes a lot of manpower and material resources, and increases the cost of geomembrane laying in the seepage control project. For this, the applicant directly abandons the traditional way of setting the embedded foundation pit, and first level the strip with the seepage control boundary of the geomembrane, Then, the expansion bolt is used to penetrate the geomembrane and geotextile in turn and connect them with the rigid foundation surface, so as to ensure that the geomembrane projected on the rigid foundation surface by the batten is close to the rigid foundation surface, And the upper end of the geomembrane is turned away from the rigid foundation surface until the bead and expansion bolt are completely wrapped, and then the welding machine is used to weld the turned part of the geomembrane and the outer wall of the geomembrane body, so as to prevent the liquid near the anti-seepage boundary from entering between the geomembrane and the rigid foundation surface along the gap between the bead, the geotextile and the expansion bolt, Avoid the failure of sealing effect of seepage control boundary.
       1.本实用新型HDPE土工膜锚固结构,直接摒弃传统的设置预埋基坑的方式,先将压条与所述土工膜的防渗边界齐平,然后利用膨胀螺栓依次贯穿土工膜、土工布后与刚性基础面连接,确保压条在刚性基础面,上投影正对的土工膜紧贴在刚性基础面.上,并且土工膜的.上端部朝远离刚性基础面的方向翻折,直至将压条以及膨胀螺栓完全包裹后,再利用焊机将土工膜的翻折部分与其本体的外壁焊接,以防止在防渗边界附近的液体沿压条、土工布与膨胀螺栓之间的间隙进入到土工膜与刚性基础面之间,避免出现防渗边界的密封效果失效;
       1. The HDPE geomembrane anchorage structure of the utility model directly abandons the traditional way of setting the embedded foundation pit, first level the strip with the anti-seepage boundary of the geomembrane, then use the expansion bolt to penetrate the geomembrane and the geotextile in turn, and then connect with the rigid foundation surface, so as to ensure that the strip is on the rigid foundation surface, and the geomembrane projected on the opposite side is closely attached to the rigid foundation surface, And the upper end of the geomembrane shall be turned away from the rigid foundation surface until the bead and expansion bolt are completely wrapped, and then the welding machine shall be used to weld the turned part of the geomembrane and the outer wall of the geomembrane body, so as to prevent the liquid near the anti-seepage boundary from entering between the geomembrane and the rigid foundation surface along the gap between the bead, the geotextile and the expansion bolt, Avoid the failure of sealing effect of seepage control boundary;
       2、本实用新型HDPE土工膜锚固结构,土工膜的.上端部翻折的目的是将压条与膨胀螺栓封隔,而该翻折部分呈圆弧形,且翻折部分的中部被膨胀螺栓的端面所支撑,即在翻折部分与土工膜的侧壁焊接后,具备一定的稳定性,不会在施工或是使用过程中因应力集中而出现翻折部分与土工膜本体之间的焊接点脱落的情况;并且膨胀螺栓将翻折部分所形成的圆弧等分,以确保翻折部整体受力均衡,避免发生二次形变;
       2. The HDPE geomembrane anchoring structure of the utility model has the purpose of folding the upper end of the geomembrane to seal the compression strip and the expansion bolt, and the folding part is arc-shaped, and the middle part of the folding part is supported by the end face of the expansion bolt, that is, after the folding part is welded with the side wall of the geomembrane, it has certain stability, During the construction or use process, the welding point between the fold over part and the geomembrane body will not fall off due to the stress concentration; and the expansion bolt will divide the arc formed by the fold over part equally to ensure the overall stress balance of the fold over part and avoid secondary deformation;
       3、本实用新型HDPE土工膜锚固结构,在压条与土工膜之间设置橡胶垫条,以在两者之间形成一定的缓冲,防止压条在膨胀螺栓的挤压下对土工膜形成过度的压迫,延长在防渗边界处的土工膜的使用寿命。
       3. The HDPE geomembrane anchoring structure of the utility model is provided with a rubber cushion strip between the compression strip and the geomembrane, so as to form a certain buffer between the two, prevent the compression strip from over pressing the geomembrane under the compression of the expansion bolt, and extend the service life of the geomembrane at the anti-seepage boundary.
       相信大家看完以上内容以后,应该也对HDPE土工膜锚固结构分析有所了解了,希望会对大家有所帮助吧。
I believe that after reading the above content, you should also understand the analysis of HDPE geomembrane anchorage structure. I hope it will help you.
      本文词标签:HDPE土工膜
      本文链接地址:http://www.sdjngc.com/news.asp?id=445


联系我时,请说是在泰安便民网看到的,谢谢!

HDPE土工膜锚固结构分析
HDPE土工膜锚固结构分析
HDPE土工膜锚固结构分析

  • 您可能感兴趣
查看更多
    温馨提示:本页信息由用户及第三方发布,真实性、合法性由发布人负责,请仔细甄别。